Delivery Risk Report

Fact

Northwind Creative · Sunday, September 6 · 7 active projects

What is about to go wrong

28

3 critical, 25 warning.

How much is exposed

$124,000

76% of $163,600 contracted.

What to do about it

Start with Meridian Law — Website Launch. Each finding below carries the specific next step.

Every finding, ranked

Ranked by severity, contract value and how much data stands behind each one.

  • 1
    critical

    Remaining work exceeds time left

    Meridian Law — Website Launch · Meridian Law Group · health 36

    49h of open work remains but only ~29h of team capacity exists before the Sep 9 deadline - a shortfall of about 20h.

    What to do

    The arithmetic does not close. Cut scope, add a person, or move Sep 9 - and say which before the client notices.

    Why?(5 rows)
    medium confidenceTask estimate hours, the project deadline, and each team member's stated weekly capacity.
    • 7 open tasks totalling 49h of estimate.
    • 2 working days left before Sep 9.
    • Sarah Chen — 36h/week stated capacity (~14h available in that window)
    • Jake Morrison — 36h/week stated capacity (~14h available in that window)
    • Shortfall: 49h needed − 29h available = 20h.

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Build a recovery plan
  • 2
    critical

    Waiting on the client

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "Partner bios — still need three" was sent 5 days ago with no reply.

    What to do

    Chase this today. Client silence is the cheapest problem to fix and the most expensive to ignore.

    Why?(1 row)
    high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
    • "Partner bios — still need three" — sent Sep 1, 5 days ago, last client reply Aug 26

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Draft a nudge
  • 3
    critical

    Waiting on the client

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Logo concepts — which direction do you want?" was sent 7 days ago with no reply.

    What to do

    Chase this today. Client silence is the cheapest problem to fix and the most expensive to ignore.

    Why?(1 row)
    high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
    • "Logo concepts — which direction do you want?" — sent Aug 30, 7 days ago, last client reply Aug 23

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Draft a nudge
  • 4
    warning

    3 tasks due soon with no owner

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Accessibility pass (WCAG AA)", "Final QA across devices", "Client sign-off on final design"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(3 rows)
    high confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Client sign-off on final design" — due Sep 7 (in 1 days), no assignee
    • "Accessibility pass (WCAG AA)" — due Sep 10 (in 4 days), no assignee
    • "Final QA across devices" — due Sep 11 (in 5 days), no assignee

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Assign owners
  • 5
    warning

    Milestone "Launch" is 3 days out

    Meridian Law — Website Launch · Meridian Law Group · health 36

    6 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(7 rows)
    high confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Launch" is dated Sep 9.
    • "Practice area pages build (8)" — in progress, Jake Morrison, due Sep 7
    • "Attorney bio pages (11)" — todo, Jake Morrison, due Sep 8
    • "Design QA pass" — todo, Sarah Chen, due Sep 8
    • "Case results database" — todo, Jake Morrison, due Sep 8
    • "301 redirect map" — todo, Unassigned, due Sep 8
    • "Final QA + launch" — todo, Jake Morrison, due Sep 9

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Build a recovery plan
  • 6
    warning

    2 tasks overdue

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    The oldest is "Write 6 service page copy blocks" (Mia Alvarez), due 3 days ago.

    What to do

    Decide today whether these dates move or the work does, then tell Sarah Chen and Mia Alvarez. Leaving them overdue is the same as silently changing the deadline.

    Why?(2 rows)
    high confidenceTask due dates and task status. No estimates or assignees needed.
    • "Write 6 service page copy blocks" — due Sep 3, 3 days ago, still in progress, Mia Alvarez
    • "Homepage design — final revision" — due Sep 4, 2 days ago, still in progress, Sarah Chen

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Build a recovery plan
  • 7
    warning

    Milestone "Build Complete" is 3 days out

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    4 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(5 rows)
    high confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Build Complete" is dated Sep 9.
    • "Build homepage" — blocked, Jake Morrison, due Sep 7
    • "Build services + team pages" — in progress, Jake Morrison, due Sep 8
    • "Online booking integration" — todo, Jake Morrison, due Sep 9
    • "Accessibility pass (WCAG AA)" — todo, Unassigned, due Sep 10

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Build a recovery plan
  • 8
    warning

    2 tasks due soon with no owner

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "301 redirect map", "Partner approval on bios"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(2 rows)
    high confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Partner approval on bios" — due Sep 6 (in 0 days), no assignee
    • "301 redirect map" — due Sep 8 (in 2 days), no assignee

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Assign owners
  • 9
    warning

    Waiting on the client

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Final homepage design for your approval" was sent 4 days ago with no reply.

    What to do

    Chase this today. Client silence is the cheapest problem to fix and the most expensive to ignore.

    Why?(1 row)
    medium confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
    • "Final homepage design for your approval" — sent Sep 2, 4 days ago, last client reply Aug 28

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Draft a nudge
  • 10
    warning

    2 tasks with no recent activity

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Homepage design — final revision" (Sarah Chen) - untouched for 4 days; "Write 6 service page copy blocks" (Mia Alvarez) - untouched for 6 days

    What to do

    Ask Sarah Chen and Mia Alvarez for a one-line status. Work marked in progress that nobody has touched is usually stuck, not slow.

    Why?(2 rows)
    high confidenceLast-activity timestamps on tasks that are in progress.
    • "Write 6 service page copy blocks" — in progress, last touched Aug 31 (6 days ago), Mia Alvarez
    • "Homepage design — final revision" — in progress, last touched Sep 2 (4 days ago), Sarah Chen

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Open the project
  • 11
    warning

    2 team members over capacity

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

    What to do

    Move work off Sarah Chen and Jake Morrison or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(2 rows)
    high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 13h of that sits on this project, across 4 projects
    • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 33h of that sits on this project, across 3 projects

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Rebalance the team
  • 12
    warning

    1 task blocked

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "Partner approval on bios" - Three partners have not returned approved bio copy

    What to do

    Resolve "Three partners have not returned approved bio copy". Blocked work does not age quietly - it moves the deadline for everything behind it.

    Why?(1 row)
    high confidenceTasks whose status is explicitly set to blocked in your tracker.
    • "Partner approval on bios" — marked blocked, Unassigned, reason: Three partners have not returned approved bio copy

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Open the blocked work
  • 13
    warning

    1 task blocked

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Build homepage" - Waiting on final homepage design from Sarah

    What to do

    Resolve "Waiting on final homepage design from Sarah". Blocked work does not age quietly - it moves the deadline for everything behind it.

    Why?(1 row)
    high confidenceTasks whose status is explicitly set to blocked in your tracker.
    • "Build homepage" — marked blocked, Jake Morrison, reason: Waiting on final homepage design from Sarah

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Open the blocked work
  • 14
    warning

    1 task blocked

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Client selects logo direction" - Ray has not responded to the concept presentation

    What to do

    Resolve "Ray has not responded to the concept presentation". Blocked work does not age quietly - it moves the deadline for everything behind it.

    Why?(1 row)
    high confidenceTasks whose status is explicitly set to blocked in your tracker.
    • "Client selects logo direction" — marked blocked, Unassigned, reason: Ray has not responded to the concept presentation

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Open the blocked work
  • 15
    warning

    Milestone "Creative Approved" is 5 days out

    Halcyon Fitness — Paid Social Launch · Halcyon Fitness · health 82

    3 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(4 rows)
    high confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Creative Approved" is dated Sep 11.
    • "Write 12 ad variations" — in progress, Mia Alvarez, due Sep 9
    • "Design 8 creative assets" — todo, Sarah Chen, due Sep 10
    • "Build landing page" — todo, Dev Patel, due Sep 11

    Measured from your data. No part of this was written by a model.

    $9,600

    at stake

    Build a recovery plan
  • 16
    warning

    2 team members over capacity

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

    What to do

    Move work off Sarah Chen and Jake Morrison or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(2 rows)
    low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 14h of that sits on this project, across 4 projects
    • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 28h of that sits on this project, across 3 projects

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Rebalance the team
  • 17
    warning

    1 task blocked by unfinished upstream work

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "Final QA + launch" is due soon but waits on "Practice area pages build (8)" and "Attorney bio pages (11)"

    What to do

    Reorder these two, or the later one slips the moment the earlier one does. Nothing here is recoverable by working harder.

    Why?(2 rows)
    medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
    • "Final QA + launch" is due Sep 9 but depends on "Practice area pages build (8)", which is still in progress
    • "Final QA + launch" is due Sep 9 but depends on "Attorney bio pages (11)", which is still todo

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Resequence the work
  • 18
    warning

    1 task overdue

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    The oldest is "Client selects logo direction" (Unassigned), due 1 days ago.

    What to do

    Decide today whether these dates move or the work does. Leaving them overdue is the same as silently changing the deadline.

    Why?(1 row)
    medium confidenceTask due dates and task status. No estimates or assignees needed.
    • "Client selects logo direction" — due Sep 5, 1 days ago, still blocked, Unassigned

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Build a recovery plan
  • 19
    warning

    Milestone "Brand Approved" is 2 days out

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    2 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(3 rows)
    medium confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Brand Approved" is dated Sep 8.
    • "Brand guidelines document" — in progress, Sarah Chen, due Sep 8
    • "Client selects logo direction" — blocked, Unassigned, due Sep 5

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Build a recovery plan
  • 20
    warning

    Milestone "Filming Wrapped" is 4 days out

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    2 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(3 rows)
    medium confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Filming Wrapped" is dated Sep 10.
    • "Film properties 7-12" — in progress, Tom Becker, due Sep 8
    • "Film agent brand reel" — todo, Tom Becker, due Sep 10

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Build a recovery plan
  • 21
    warning

    1 team member over capacity

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    Tom Becker is at 180% (54h assigned vs 30h capacity)

    What to do

    Move work off Tom Becker or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(1 row)
    high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Tom Becker — 54h due in the next 7 days vs 30h weekly capacity (180%); 58h of that sits on this project, across 2 projects

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Rebalance the team
  • 22
    warning

    1 task due soon with no owner

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Client selects logo direction"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(1 row)
    medium confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Client selects logo direction" — due Sep 5 (in -1 days), no assignee

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Assign owners
  • 23
    warning

    1 task blocked by unfinished upstream work

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Homepage wireframe" is due soon but waits on "Client selects logo direction"

    What to do

    Reorder these two, or the later one slips the moment the earlier one does. Nothing here is recoverable by working harder.

    Why?(1 row)
    medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
    • "Homepage wireframe" is due Sep 12 but depends on "Client selects logo direction", which is still blocked

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Resequence the work
  • 24
    warning

    1 task with no recent activity

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    "Film properties 7-12" (Tom Becker) - untouched for 4 days

    What to do

    Ask Tom Becker for a one-line status. Work marked in progress that nobody has touched is usually stuck, not slow.

    Why?(1 row)
    medium confidenceLast-activity timestamps on tasks that are in progress.
    • "Film properties 7-12" — in progress, last touched Sep 2 (4 days ago), Tom Becker

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Open the project
  • 25
    warning

    1 task due soon with no owner

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    "Client review round"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(1 row)
    medium confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Client review round" — due Sep 16 (in 10 days), no assignee

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Assign owners
  • 26
    warning

    1 task blocked by unfinished upstream work

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    "Edit properties 7-12" is due soon but waits on "Film properties 7-12"

    What to do

    Reorder these two, or the later one slips the moment the earlier one does. Nothing here is recoverable by working harder.

    Why?(1 row)
    medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
    • "Edit properties 7-12" is due Sep 13 but depends on "Film properties 7-12", which is still in progress

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Resequence the work
  • 27
    warning

    1 team member over capacity

    Meridian Law — Website Launch · Meridian Law Group · health 36

    Jake Morrison is at 192% (69h assigned vs 36h capacity)

    What to do

    Move work off Jake Morrison or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(1 row)
    low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 36h of that sits on this project, across 3 projects

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Rebalance the team
  • 28
    warning

    1 team member over capacity

    Halcyon Fitness — Paid Social Launch · Halcyon Fitness · health 82

    Sarah Chen is at 119% (43h assigned vs 36h capacity)

    What to do

    Move work off Sarah Chen or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(1 row)
    low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 10h of that sits on this project, across 4 projects

    Measured from your data. No part of this was written by a model.

    $9,600

    at stake

    Rebalance the team

Where the score comes from

Delivery health is 58. These five areas are what moves it — they are a diagnosis, not five more scores.

Deadline reliability

93

3 of 45 dated open tasks are past their date.

Capacity health

50

3 of 6 people are committed beyond their stated weekly hours.

Client responsiveness

25

3 of 4 clients with an open thread are slow or silent.

Task health

87

3 blocked and 3 untouched out of 45 open tasks.

Project stability

43

4 of 7 projects are outside the on-track band.

Client responsiveness is the weakest area at 25/100. Deadline reliability is the strongest at 93/100.

Every project

Worst first. Percent done is weighted by estimated hours.

  • Due Sep 9 · 51% of the work done against 94% of the time · 43 points behind pace

    • criticalRemaining work exceeds time left28 pts

      49h of open work remains but only ~29h of team capacity exists before the Sep 9 deadline - a shortfall of about 20h.

      Why?(5 rows)
      medium confidenceTask estimate hours, the project deadline, and each team member's stated weekly capacity.
      • 7 open tasks totalling 49h of estimate.
      • 2 working days left before Sep 9.
      • Sarah Chen — 36h/week stated capacity (~14h available in that window)
      • Jake Morrison — 36h/week stated capacity (~14h available in that window)
      • Shortfall: 49h needed − 29h available = 20h.

      Measured from your data. No part of this was written by a model.

    • criticalWaiting on the client15 pts

      "Partner bios — still need three" was sent 5 days ago with no reply.

      Why?(1 row)
      high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
      • "Partner bios — still need three" — sent Sep 1, 5 days ago, last client reply Aug 26

      Measured from your data. No part of this was written by a model.

    • warningMilestone "Launch" is 3 days out12 pts

      6 tasks under this milestone are still open.

      Why?(7 rows)
      high confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Launch" is dated Sep 9.
      • "Practice area pages build (8)" — in progress, Jake Morrison, due Sep 7
      • "Attorney bio pages (11)" — todo, Jake Morrison, due Sep 8
      • "Design QA pass" — todo, Sarah Chen, due Sep 8
      • "Case results database" — todo, Jake Morrison, due Sep 8
      • "301 redirect map" — todo, Unassigned, due Sep 8
      • "Final QA + launch" — todo, Jake Morrison, due Sep 9

      Measured from your data. No part of this was written by a model.

    • warning2 tasks due soon with no owner10 pts

      "301 redirect map", "Partner approval on bios"

      Why?(2 rows)
      high confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Partner approval on bios" — due Sep 6 (in 0 days), no assignee
      • "301 redirect map" — due Sep 8 (in 2 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked8 pts

      "Partner approval on bios" - Three partners have not returned approved bio copy

      Why?(1 row)
      high confidenceTasks whose status is explicitly set to blocked in your tracker.
      • "Partner approval on bios" — marked blocked, Unassigned, reason: Three partners have not returned approved bio copy

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked by unfinished upstream work5 pts

      "Final QA + launch" is due soon but waits on "Practice area pages build (8)" and "Attorney bio pages (11)"

      Why?(2 rows)
      medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
      • "Final QA + launch" is due Sep 9 but depends on "Practice area pages build (8)", which is still in progress
      • "Final QA + launch" is due Sep 9 but depends on "Attorney bio pages (11)", which is still todo

      Measured from your data. No part of this was written by a model.

    • warning1 team member over capacity5 pts

      Jake Morrison is at 192% (69h assigned vs 36h capacity)

      Why?(1 row)
      low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 36h of that sits on this project, across 3 projects

      Measured from your data. No part of this was written by a model.

  • Due Sep 12 · 47% of the work done against 86% of the time · 39 points behind pace

    • warning3 tasks due soon with no owner15 pts

      "Accessibility pass (WCAG AA)", "Final QA across devices", "Client sign-off on final design"

      Why?(3 rows)
      high confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Client sign-off on final design" — due Sep 7 (in 1 days), no assignee
      • "Accessibility pass (WCAG AA)" — due Sep 10 (in 4 days), no assignee
      • "Final QA across devices" — due Sep 11 (in 5 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning2 tasks overdue12 pts

      The oldest is "Write 6 service page copy blocks" (Mia Alvarez), due 3 days ago.

      Why?(2 rows)
      high confidenceTask due dates and task status. No estimates or assignees needed.
      • "Write 6 service page copy blocks" — due Sep 3, 3 days ago, still in progress, Mia Alvarez
      • "Homepage design — final revision" — due Sep 4, 2 days ago, still in progress, Sarah Chen

      Measured from your data. No part of this was written by a model.

    • warningWaiting on the client12 pts

      "Final homepage design for your approval" was sent 4 days ago with no reply.

      Why?(1 row)
      medium confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
      • "Final homepage design for your approval" — sent Sep 2, 4 days ago, last client reply Aug 28

      Measured from your data. No part of this was written by a model.

    • warningMilestone "Build Complete" is 3 days out12 pts

      4 tasks under this milestone are still open.

      Why?(5 rows)
      high confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Build Complete" is dated Sep 9.
      • "Build homepage" — blocked, Jake Morrison, due Sep 7
      • "Build services + team pages" — in progress, Jake Morrison, due Sep 8
      • "Online booking integration" — todo, Jake Morrison, due Sep 9
      • "Accessibility pass (WCAG AA)" — todo, Unassigned, due Sep 10

      Measured from your data. No part of this was written by a model.

    • warning2 tasks with no recent activity10 pts

      "Homepage design — final revision" (Sarah Chen) - untouched for 4 days; "Write 6 service page copy blocks" (Mia Alvarez) - untouched for 6 days

      Why?(2 rows)
      high confidenceLast-activity timestamps on tasks that are in progress.
      • "Write 6 service page copy blocks" — in progress, last touched Aug 31 (6 days ago), Mia Alvarez
      • "Homepage design — final revision" — in progress, last touched Sep 2 (4 days ago), Sarah Chen

      Measured from your data. No part of this was written by a model.

    • warning2 team members over capacity10 pts

      Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

      Why?(2 rows)
      high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 13h of that sits on this project, across 4 projects
      • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 33h of that sits on this project, across 3 projects

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked8 pts

      "Build homepage" - Waiting on final homepage design from Sarah

      Why?(1 row)
      high confidenceTasks whose status is explicitly set to blocked in your tracker.
      • "Build homepage" — marked blocked, Jake Morrison, reason: Waiting on final homepage design from Sarah

      Measured from your data. No part of this was written by a model.

  • Due Sep 25 · 17% of the work done against 56% of the time · 39 points behind pace

    • criticalWaiting on the client18 pts

      "Logo concepts — which direction do you want?" was sent 7 days ago with no reply.

      Why?(1 row)
      high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
      • "Logo concepts — which direction do you want?" — sent Aug 30, 7 days ago, last client reply Aug 23

      Measured from your data. No part of this was written by a model.

    • warning2 team members over capacity10 pts

      Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

      Why?(2 rows)
      low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 14h of that sits on this project, across 4 projects
      • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 28h of that sits on this project, across 3 projects

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked8 pts

      "Client selects logo direction" - Ray has not responded to the concept presentation

      Why?(1 row)
      high confidenceTasks whose status is explicitly set to blocked in your tracker.
      • "Client selects logo direction" — marked blocked, Unassigned, reason: Ray has not responded to the concept presentation

      Measured from your data. No part of this was written by a model.

    • warning1 task overdue6 pts

      The oldest is "Client selects logo direction" (Unassigned), due 1 days ago.

      Why?(1 row)
      medium confidenceTask due dates and task status. No estimates or assignees needed.
      • "Client selects logo direction" — due Sep 5, 1 days ago, still blocked, Unassigned

      Measured from your data. No part of this was written by a model.

    • warningMilestone "Brand Approved" is 2 days out6 pts

      2 tasks under this milestone are still open.

      Why?(3 rows)
      medium confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Brand Approved" is dated Sep 8.
      • "Brand guidelines document" — in progress, Sarah Chen, due Sep 8
      • "Client selects logo direction" — blocked, Unassigned, due Sep 5

      Measured from your data. No part of this was written by a model.

    • warning1 task due soon with no owner5 pts

      "Client selects logo direction"

      Why?(1 row)
      medium confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Client selects logo direction" — due Sep 5 (in -1 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked by unfinished upstream work5 pts

      "Homepage wireframe" is due soon but waits on "Client selects logo direction"

      Why?(1 row)
      medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
      • "Homepage wireframe" is due Sep 12 but depends on "Client selects logo direction", which is still blocked

      Measured from your data. No part of this was written by a model.

  • Due Sep 18 · 23% of the work done against 71% of the time · 48 points behind pace

    • warningMilestone "Filming Wrapped" is 4 days out6 pts

      2 tasks under this milestone are still open.

      Why?(3 rows)
      medium confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Filming Wrapped" is dated Sep 10.
      • "Film properties 7-12" — in progress, Tom Becker, due Sep 8
      • "Film agent brand reel" — todo, Tom Becker, due Sep 10

      Measured from your data. No part of this was written by a model.

    • warning1 task with no recent activity5 pts

      "Film properties 7-12" (Tom Becker) - untouched for 4 days

      Why?(1 row)
      medium confidenceLast-activity timestamps on tasks that are in progress.
      • "Film properties 7-12" — in progress, last touched Sep 2 (4 days ago), Tom Becker

      Measured from your data. No part of this was written by a model.

    • warning1 task due soon with no owner5 pts

      "Client review round"

      Why?(1 row)
      medium confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Client review round" — due Sep 16 (in 10 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked by unfinished upstream work5 pts

      "Edit properties 7-12" is due soon but waits on "Film properties 7-12"

      Why?(1 row)
      medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
      • "Edit properties 7-12" is due Sep 13 but depends on "Film properties 7-12", which is still in progress

      Measured from your data. No part of this was written by a model.

    • warning1 team member over capacity5 pts

      Tom Becker is at 180% (54h assigned vs 30h capacity)

      Why?(1 row)
      high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Tom Becker — 54h due in the next 7 days vs 30h weekly capacity (180%); 58h of that sits on this project, across 2 projects

      Measured from your data. No part of this was written by a model.

  • Due Sep 27 · 14% of the work done against 43% of the time · 29 points behind pace

    • warningMilestone "Creative Approved" is 5 days out9 pts

      3 tasks under this milestone are still open.

      Why?(4 rows)
      high confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Creative Approved" is dated Sep 11.
      • "Write 12 ad variations" — in progress, Mia Alvarez, due Sep 9
      • "Design 8 creative assets" — todo, Sarah Chen, due Sep 10
      • "Build landing page" — todo, Dev Patel, due Sep 11

      Measured from your data. No part of this was written by a model.

    • warning1 team member over capacity5 pts

      Sarah Chen is at 119% (43h assigned vs 36h capacity)

      Why?(1 row)
      low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 10h of that sits on this project, across 4 projects

      Measured from your data. No part of this was written by a model.

  • Due Oct 10 · 36% of the work done against 60% of the time · 24 points behind pace

    No signals fired on this project.

  • Due Oct 17 · 14% of the work done against 33% of the time · 19 points behind pace

    No signals fired on this project.

How this was produced

Ten checks ran against every active project: overdue work, remaining work versus time left, passed deadlines, blocked tasks, inactivity, unowned work, client silence, unfinished upstream work, over-committed people, and milestones inside a week. Each finding subtracts points from a starting score of 100 on a curve that never bottoms out, so the worst project stays comparable to the second worst. Every number on this page can be traced to specific rows — open any “Why?” to see them.

6 of 8 data-quality checks passed. See what the gaps cost you →