Project Brain

Delivery Risk Report

Fact

Northwind Creative · Friday, October 23 · 7 active projects

What is about to go wrong

28

3 critical, 25 warning.

How much is exposed

$124,000

76% of $163,600 contracted.

What to do about it

Start with Meridian Law — Website Launch. Each finding below carries the specific next step.

Every finding, ranked

Ranked by severity, contract value and how much data stands behind each one.

  • 1
    critical

    Remaining work exceeds time left

    Meridian Law — Website Launch · Meridian Law Group · health 36

    49h of open work remains but only ~14h of team capacity exists before the Oct 26 deadline - a shortfall of about 35h.

    What to do

    The arithmetic does not close. Cut scope, add a person, or move Oct 26 - and say which before the client notices.

    Why?(5 rows)
    medium confidenceTask estimate hours, the project deadline, and each team member's stated weekly capacity.
    • 7 open tasks totalling 49h of estimate.
    • 1 working day left before Oct 26.
    • Sarah Chen — 36h/week stated capacity (~7h available in that window)
    • Jake Morrison — 36h/week stated capacity (~7h available in that window)
    • Shortfall: 49h needed − 14h available = 35h.

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Build a recovery plan
  • 2
    critical

    Waiting on the client

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "Partner bios — still need three" was sent 5 days ago with no reply.

    What to do

    Chase this today. Client silence is the cheapest problem to fix and the most expensive to ignore.

    Why?(1 row)
    high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
    • "Partner bios — still need three" — sent Oct 18, 5 days ago, last client reply Oct 12

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Draft a nudge
  • 3
    critical

    Waiting on the client

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Logo concepts — which direction do you want?" was sent 7 days ago with no reply.

    What to do

    Chase this today. Client silence is the cheapest problem to fix and the most expensive to ignore.

    Why?(1 row)
    high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
    • "Logo concepts — which direction do you want?" — sent Oct 16, 7 days ago, last client reply Oct 9

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Draft a nudge
  • 4
    warning

    3 tasks due soon with no owner

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Accessibility pass (WCAG AA)", "Final QA across devices", "Client sign-off on final design"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(3 rows)
    high confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Client sign-off on final design" — due Oct 24 (in 1 days), no assignee
    • "Accessibility pass (WCAG AA)" — due Oct 27 (in 4 days), no assignee
    • "Final QA across devices" — due Oct 28 (in 5 days), no assignee

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Assign owners
  • 5
    warning

    Milestone "Launch" is 3 days out

    Meridian Law — Website Launch · Meridian Law Group · health 36

    6 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(7 rows)
    high confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Launch" is dated Oct 26.
    • "Practice area pages build (8)" — in progress, Jake Morrison, due Oct 24
    • "Attorney bio pages (11)" — todo, Jake Morrison, due Oct 25
    • "Design QA pass" — todo, Sarah Chen, due Oct 25
    • "Case results database" — todo, Jake Morrison, due Oct 25
    • "301 redirect map" — todo, Unassigned, due Oct 25
    • "Final QA + launch" — todo, Jake Morrison, due Oct 26

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Build a recovery plan
  • 6
    warning

    2 tasks overdue

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    The oldest is "Write 6 service page copy blocks" (Mia Alvarez), due 3 days ago.

    What to do

    Decide today whether these dates move or the work does, then tell Sarah Chen and Mia Alvarez. Leaving them overdue is the same as silently changing the deadline.

    Why?(2 rows)
    high confidenceTask due dates and task status. No estimates or assignees needed.
    • "Write 6 service page copy blocks" — due Oct 20, 3 days ago, still in progress, Mia Alvarez
    • "Homepage design — final revision" — due Oct 21, 2 days ago, still in progress, Sarah Chen

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Build a recovery plan
  • 7
    warning

    Milestone "Build Complete" is 3 days out

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    4 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(5 rows)
    high confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Build Complete" is dated Oct 26.
    • "Build homepage" — blocked, Jake Morrison, due Oct 24
    • "Build services + team pages" — in progress, Jake Morrison, due Oct 25
    • "Online booking integration" — todo, Jake Morrison, due Oct 26
    • "Accessibility pass (WCAG AA)" — todo, Unassigned, due Oct 27

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Build a recovery plan
  • 8
    warning

    2 tasks due soon with no owner

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "301 redirect map", "Partner approval on bios"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(2 rows)
    high confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Partner approval on bios" — due Oct 23 (in 0 days), no assignee
    • "301 redirect map" — due Oct 25 (in 2 days), no assignee

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Assign owners
  • 9
    warning

    Waiting on the client

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Final homepage design for your approval" was sent 4 days ago with no reply.

    What to do

    Chase this today. Client silence is the cheapest problem to fix and the most expensive to ignore.

    Why?(1 row)
    medium confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
    • "Final homepage design for your approval" — sent Oct 19, 4 days ago, last client reply Oct 14

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Draft a nudge
  • 10
    warning

    2 tasks with no recent activity

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Homepage design — final revision" (Sarah Chen) - untouched for 4 days; "Write 6 service page copy blocks" (Mia Alvarez) - untouched for 6 days

    What to do

    Ask Sarah Chen and Mia Alvarez for a one-line status. Work marked in progress that nobody has touched is usually stuck, not slow.

    Why?(2 rows)
    high confidenceLast-activity timestamps on tasks that are in progress.
    • "Write 6 service page copy blocks" — in progress, last touched Oct 17 (6 days ago), Mia Alvarez
    • "Homepage design — final revision" — in progress, last touched Oct 19 (4 days ago), Sarah Chen

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Open the project
  • 11
    warning

    2 team members over capacity

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

    What to do

    Move work off Sarah Chen and Jake Morrison or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(2 rows)
    high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 13h of that sits on this project, across 4 projects
    • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 33h of that sits on this project, across 3 projects

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Rebalance the team
  • 12
    warning

    1 task blocked

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "Partner approval on bios" - Three partners have not returned approved bio copy

    What to do

    Resolve "Three partners have not returned approved bio copy". Blocked work does not age quietly - it moves the deadline for everything behind it.

    Why?(1 row)
    high confidenceTasks whose status is explicitly set to blocked in your tracker.
    • "Partner approval on bios" — marked blocked, Unassigned, reason: Three partners have not returned approved bio copy

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Open the blocked work
  • 13
    warning

    1 task blocked

    Brightline Dental — Website Redesign · Brightline Dental · health 38

    "Build homepage" - Waiting on final homepage design from Sarah

    What to do

    Resolve "Waiting on final homepage design from Sarah". Blocked work does not age quietly - it moves the deadline for everything behind it.

    Why?(1 row)
    high confidenceTasks whose status is explicitly set to blocked in your tracker.
    • "Build homepage" — marked blocked, Jake Morrison, reason: Waiting on final homepage design from Sarah

    Measured from your data. No part of this was written by a model.

    $24,000

    at stake

    Open the blocked work
  • 14
    warning

    1 task blocked

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Client selects logo direction" - Ray has not responded to the concept presentation

    What to do

    Resolve "Ray has not responded to the concept presentation". Blocked work does not age quietly - it moves the deadline for everything behind it.

    Why?(1 row)
    high confidenceTasks whose status is explicitly set to blocked in your tracker.
    • "Client selects logo direction" — marked blocked, Unassigned, reason: Ray has not responded to the concept presentation

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Open the blocked work
  • 15
    warning

    Milestone "Creative Approved" is 5 days out

    Halcyon Fitness — Paid Social Launch · Halcyon Fitness · health 82

    3 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(4 rows)
    high confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Creative Approved" is dated Oct 28.
    • "Write 12 ad variations" — in progress, Mia Alvarez, due Oct 26
    • "Design 8 creative assets" — todo, Sarah Chen, due Oct 27
    • "Build landing page" — todo, Dev Patel, due Oct 28

    Measured from your data. No part of this was written by a model.

    $9,600

    at stake

    Build a recovery plan
  • 16
    warning

    2 team members over capacity

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

    What to do

    Move work off Sarah Chen and Jake Morrison or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(2 rows)
    low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 14h of that sits on this project, across 4 projects
    • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 28h of that sits on this project, across 3 projects

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Rebalance the team
  • 17
    warning

    1 task blocked by unfinished upstream work

    Meridian Law — Website Launch · Meridian Law Group · health 36

    "Final QA + launch" is due soon but waits on "Practice area pages build (8)" and "Attorney bio pages (11)"

    What to do

    Reorder these two, or the later one slips the moment the earlier one does. Nothing here is recoverable by working harder.

    Why?(2 rows)
    medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
    • "Final QA + launch" is due Oct 26 but depends on "Practice area pages build (8)", which is still in progress
    • "Final QA + launch" is due Oct 26 but depends on "Attorney bio pages (11)", which is still todo

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Resequence the work
  • 18
    warning

    1 task overdue

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    The oldest is "Client selects logo direction" (Unassigned), due 1 days ago.

    What to do

    Decide today whether these dates move or the work does. Leaving them overdue is the same as silently changing the deadline.

    Why?(1 row)
    medium confidenceTask due dates and task status. No estimates or assignees needed.
    • "Client selects logo direction" — due Oct 22, 1 days ago, still blocked, Unassigned

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Build a recovery plan
  • 19
    warning

    Milestone "Brand Approved" is 2 days out

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    2 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(3 rows)
    medium confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Brand Approved" is dated Oct 25.
    • "Brand guidelines document" — in progress, Sarah Chen, due Oct 25
    • "Client selects logo direction" — blocked, Unassigned, due Oct 22

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Build a recovery plan
  • 20
    warning

    Milestone "Filming Wrapped" is 4 days out

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    2 tasks under this milestone are still open.

    What to do

    Confirm this milestone lands or move it now, while moving it is still a scheduling decision rather than an apology.

    Why?(3 rows)
    medium confidenceThe milestone due date and the status of the tasks attached to it.
    • Milestone "Filming Wrapped" is dated Oct 27.
    • "Film properties 7-12" — in progress, Tom Becker, due Oct 25
    • "Film agent brand reel" — todo, Tom Becker, due Oct 27

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Build a recovery plan
  • 21
    warning

    1 team member over capacity

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    Tom Becker is at 180% (54h assigned vs 30h capacity)

    What to do

    Move work off Tom Becker or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(1 row)
    high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Tom Becker — 54h due in the next 7 days vs 30h weekly capacity (180%); 58h of that sits on this project, across 2 projects

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Rebalance the team
  • 22
    warning

    1 task due soon with no owner

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Client selects logo direction"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(1 row)
    medium confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Client selects logo direction" — due Oct 22 (in -1 days), no assignee

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Assign owners
  • 23
    warning

    1 task blocked by unfinished upstream work

    Vantage Roofing — Brand & Site · Vantage Roofing · health 47

    "Homepage wireframe" is due soon but waits on "Client selects logo direction"

    What to do

    Reorder these two, or the later one slips the moment the earlier one does. Nothing here is recoverable by working harder.

    Why?(1 row)
    medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
    • "Homepage wireframe" is due Oct 29 but depends on "Client selects logo direction", which is still blocked

    Measured from your data. No part of this was written by a model.

    $31,500

    at stake

    Resequence the work
  • 24
    warning

    1 task with no recent activity

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    "Film properties 7-12" (Tom Becker) - untouched for 4 days

    What to do

    Ask Tom Becker for a one-line status. Work marked in progress that nobody has touched is usually stuck, not slow.

    Why?(1 row)
    medium confidenceLast-activity timestamps on tasks that are in progress.
    • "Film properties 7-12" — in progress, last touched Oct 19 (4 days ago), Tom Becker

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Open the project
  • 25
    warning

    1 task due soon with no owner

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    "Client review round"

    What to do

    Put a name on each of these before end of day. Work due inside two weeks with no owner is work nobody has started.

    Why?(1 row)
    medium confidenceTasks with a due date inside 14 days and an empty assignee field.
    • "Client review round" — due Nov 2 (in 10 days), no assignee

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Assign owners
  • 26
    warning

    1 task blocked by unfinished upstream work

    Northshore Realty — Listing Video Series · Northshore Realty · health 70

    "Edit properties 7-12" is due soon but waits on "Film properties 7-12"

    What to do

    Reorder these two, or the later one slips the moment the earlier one does. Nothing here is recoverable by working harder.

    Why?(1 row)
    medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
    • "Edit properties 7-12" is due Oct 30 but depends on "Film properties 7-12", which is still in progress

    Measured from your data. No part of this was written by a model.

    $22,500

    at stake

    Resequence the work
  • 27
    warning

    1 team member over capacity

    Meridian Law — Website Launch · Meridian Law Group · health 36

    Jake Morrison is at 192% (69h assigned vs 36h capacity)

    What to do

    Move work off Jake Morrison or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(1 row)
    low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 36h of that sits on this project, across 3 projects

    Measured from your data. No part of this was written by a model.

    $46,000

    at stake

    Rebalance the team
  • 28
    warning

    1 team member over capacity

    Halcyon Fitness — Paid Social Launch · Halcyon Fitness · health 82

    Sarah Chen is at 119% (43h assigned vs 36h capacity)

    What to do

    Move work off Sarah Chen or extend the dates. An over-committed week does not resolve itself, it just fails later.

    Why?(1 row)
    low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
    • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 10h of that sits on this project, across 4 projects

    Measured from your data. No part of this was written by a model.

    $9,600

    at stake

    Rebalance the team

Where the score comes from

Delivery health is 58. These five areas are what moves it — they are a diagnosis, not five more scores.

Deadline reliability

93

3 of 45 dated open tasks are past their date.

Capacity health

50

3 of 6 people are committed beyond their stated weekly hours.

Client responsiveness

25

3 of 4 clients with an open thread are slow or silent.

Task health

87

3 blocked and 3 untouched out of 45 open tasks.

Project stability

43

4 of 7 projects are outside the on-track band.

Client responsiveness is the weakest area at 25/100. Deadline reliability is the strongest at 93/100.

Every project

Worst first. Percent done is weighted by estimated hours.

  • Due Oct 26 · 51% of the work done against 94% of the time · 43 points behind pace

    • criticalRemaining work exceeds time left−30 pts

      49h of open work remains but only ~14h of team capacity exists before the Oct 26 deadline - a shortfall of about 35h.

      Why?(5 rows)
      medium confidenceTask estimate hours, the project deadline, and each team member's stated weekly capacity.
      • 7 open tasks totalling 49h of estimate.
      • 1 working day left before Oct 26.
      • Sarah Chen — 36h/week stated capacity (~7h available in that window)
      • Jake Morrison — 36h/week stated capacity (~7h available in that window)
      • Shortfall: 49h needed − 14h available = 35h.

      Measured from your data. No part of this was written by a model.

    • criticalWaiting on the client−15 pts

      "Partner bios — still need three" was sent 5 days ago with no reply.

      Why?(1 row)
      high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
      • "Partner bios — still need three" — sent Oct 18, 5 days ago, last client reply Oct 12

      Measured from your data. No part of this was written by a model.

    • warningMilestone "Launch" is 3 days out−12 pts

      6 tasks under this milestone are still open.

      Why?(7 rows)
      high confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Launch" is dated Oct 26.
      • "Practice area pages build (8)" — in progress, Jake Morrison, due Oct 24
      • "Attorney bio pages (11)" — todo, Jake Morrison, due Oct 25
      • "Design QA pass" — todo, Sarah Chen, due Oct 25
      • "Case results database" — todo, Jake Morrison, due Oct 25
      • "301 redirect map" — todo, Unassigned, due Oct 25
      • "Final QA + launch" — todo, Jake Morrison, due Oct 26

      Measured from your data. No part of this was written by a model.

    • warning2 tasks due soon with no owner−10 pts

      "301 redirect map", "Partner approval on bios"

      Why?(2 rows)
      high confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Partner approval on bios" — due Oct 23 (in 0 days), no assignee
      • "301 redirect map" — due Oct 25 (in 2 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked−8 pts

      "Partner approval on bios" - Three partners have not returned approved bio copy

      Why?(1 row)
      high confidenceTasks whose status is explicitly set to blocked in your tracker.
      • "Partner approval on bios" — marked blocked, Unassigned, reason: Three partners have not returned approved bio copy

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked by unfinished upstream work−5 pts

      "Final QA + launch" is due soon but waits on "Practice area pages build (8)" and "Attorney bio pages (11)"

      Why?(2 rows)
      medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
      • "Final QA + launch" is due Oct 26 but depends on "Practice area pages build (8)", which is still in progress
      • "Final QA + launch" is due Oct 26 but depends on "Attorney bio pages (11)", which is still todo

      Measured from your data. No part of this was written by a model.

    • warning1 team member over capacity−5 pts

      Jake Morrison is at 192% (69h assigned vs 36h capacity)

      Why?(1 row)
      low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 36h of that sits on this project, across 3 projects

      Measured from your data. No part of this was written by a model.

  • Due Oct 29 · 47% of the work done against 86% of the time · 39 points behind pace

    • warning3 tasks due soon with no owner−15 pts

      "Accessibility pass (WCAG AA)", "Final QA across devices", "Client sign-off on final design"

      Why?(3 rows)
      high confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Client sign-off on final design" — due Oct 24 (in 1 days), no assignee
      • "Accessibility pass (WCAG AA)" — due Oct 27 (in 4 days), no assignee
      • "Final QA across devices" — due Oct 28 (in 5 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning2 tasks overdue−12 pts

      The oldest is "Write 6 service page copy blocks" (Mia Alvarez), due 3 days ago.

      Why?(2 rows)
      high confidenceTask due dates and task status. No estimates or assignees needed.
      • "Write 6 service page copy blocks" — due Oct 20, 3 days ago, still in progress, Mia Alvarez
      • "Homepage design — final revision" — due Oct 21, 2 days ago, still in progress, Sarah Chen

      Measured from your data. No part of this was written by a model.

    • warningWaiting on the client−12 pts

      "Final homepage design for your approval" was sent 4 days ago with no reply.

      Why?(1 row)
      medium confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
      • "Final homepage design for your approval" — sent Oct 19, 4 days ago, last client reply Oct 14

      Measured from your data. No part of this was written by a model.

    • warningMilestone "Build Complete" is 3 days out−12 pts

      4 tasks under this milestone are still open.

      Why?(5 rows)
      high confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Build Complete" is dated Oct 26.
      • "Build homepage" — blocked, Jake Morrison, due Oct 24
      • "Build services + team pages" — in progress, Jake Morrison, due Oct 25
      • "Online booking integration" — todo, Jake Morrison, due Oct 26
      • "Accessibility pass (WCAG AA)" — todo, Unassigned, due Oct 27

      Measured from your data. No part of this was written by a model.

    • warning2 tasks with no recent activity−10 pts

      "Homepage design — final revision" (Sarah Chen) - untouched for 4 days; "Write 6 service page copy blocks" (Mia Alvarez) - untouched for 6 days

      Why?(2 rows)
      high confidenceLast-activity timestamps on tasks that are in progress.
      • "Write 6 service page copy blocks" — in progress, last touched Oct 17 (6 days ago), Mia Alvarez
      • "Homepage design — final revision" — in progress, last touched Oct 19 (4 days ago), Sarah Chen

      Measured from your data. No part of this was written by a model.

    • warning2 team members over capacity−10 pts

      Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

      Why?(2 rows)
      high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 13h of that sits on this project, across 4 projects
      • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 33h of that sits on this project, across 3 projects

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked−8 pts

      "Build homepage" - Waiting on final homepage design from Sarah

      Why?(1 row)
      high confidenceTasks whose status is explicitly set to blocked in your tracker.
      • "Build homepage" — marked blocked, Jake Morrison, reason: Waiting on final homepage design from Sarah

      Measured from your data. No part of this was written by a model.

  • Due Nov 11 · 17% of the work done against 56% of the time · 39 points behind pace

    • criticalWaiting on the client−18 pts

      "Logo concepts — which direction do you want?" was sent 7 days ago with no reply.

      Why?(1 row)
      high confidenceClient threads flagged as awaiting a reply, and the date we last sent something.
      • "Logo concepts — which direction do you want?" — sent Oct 16, 7 days ago, last client reply Oct 9

      Measured from your data. No part of this was written by a model.

    • warning2 team members over capacity−10 pts

      Sarah Chen is at 119% (43h assigned vs 36h capacity); Jake Morrison is at 192% (69h assigned vs 36h capacity)

      Why?(2 rows)
      low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 14h of that sits on this project, across 4 projects
      • Jake Morrison — 69h due in the next 7 days vs 36h weekly capacity (192%); 28h of that sits on this project, across 3 projects

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked−8 pts

      "Client selects logo direction" - Ray has not responded to the concept presentation

      Why?(1 row)
      high confidenceTasks whose status is explicitly set to blocked in your tracker.
      • "Client selects logo direction" — marked blocked, Unassigned, reason: Ray has not responded to the concept presentation

      Measured from your data. No part of this was written by a model.

    • warning1 task overdue−6 pts

      The oldest is "Client selects logo direction" (Unassigned), due 1 days ago.

      Why?(1 row)
      medium confidenceTask due dates and task status. No estimates or assignees needed.
      • "Client selects logo direction" — due Oct 22, 1 days ago, still blocked, Unassigned

      Measured from your data. No part of this was written by a model.

    • warningMilestone "Brand Approved" is 2 days out−6 pts

      2 tasks under this milestone are still open.

      Why?(3 rows)
      medium confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Brand Approved" is dated Oct 25.
      • "Brand guidelines document" — in progress, Sarah Chen, due Oct 25
      • "Client selects logo direction" — blocked, Unassigned, due Oct 22

      Measured from your data. No part of this was written by a model.

    • warning1 task due soon with no owner−5 pts

      "Client selects logo direction"

      Why?(1 row)
      medium confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Client selects logo direction" — due Oct 22 (in -1 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked by unfinished upstream work−5 pts

      "Homepage wireframe" is due soon but waits on "Client selects logo direction"

      Why?(1 row)
      medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
      • "Homepage wireframe" is due Oct 29 but depends on "Client selects logo direction", which is still blocked

      Measured from your data. No part of this was written by a model.

  • Due Nov 4 · 23% of the work done against 71% of the time · 48 points behind pace

    • warningMilestone "Filming Wrapped" is 4 days out−6 pts

      2 tasks under this milestone are still open.

      Why?(3 rows)
      medium confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Filming Wrapped" is dated Oct 27.
      • "Film properties 7-12" — in progress, Tom Becker, due Oct 25
      • "Film agent brand reel" — todo, Tom Becker, due Oct 27

      Measured from your data. No part of this was written by a model.

    • warning1 task with no recent activity−5 pts

      "Film properties 7-12" (Tom Becker) - untouched for 4 days

      Why?(1 row)
      medium confidenceLast-activity timestamps on tasks that are in progress.
      • "Film properties 7-12" — in progress, last touched Oct 19 (4 days ago), Tom Becker

      Measured from your data. No part of this was written by a model.

    • warning1 task due soon with no owner−5 pts

      "Client review round"

      Why?(1 row)
      medium confidenceTasks with a due date inside 14 days and an empty assignee field.
      • "Client review round" — due Nov 2 (in 10 days), no assignee

      Measured from your data. No part of this was written by a model.

    • warning1 task blocked by unfinished upstream work−5 pts

      "Edit properties 7-12" is due soon but waits on "Film properties 7-12"

      Why?(1 row)
      medium confidenceRecorded task dependencies, the due date of the dependent task, and the status of the upstream task.
      • "Edit properties 7-12" is due Oct 30 but depends on "Film properties 7-12", which is still in progress

      Measured from your data. No part of this was written by a model.

    • warning1 team member over capacity−5 pts

      Tom Becker is at 180% (54h assigned vs 30h capacity)

      Why?(1 row)
      high confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Tom Becker — 54h due in the next 7 days vs 30h weekly capacity (180%); 58h of that sits on this project, across 2 projects

      Measured from your data. No part of this was written by a model.

  • Due Nov 13 · 14% of the work done against 43% of the time · 29 points behind pace

    • warningMilestone "Creative Approved" is 5 days out−9 pts

      3 tasks under this milestone are still open.

      Why?(4 rows)
      high confidenceThe milestone due date and the status of the tasks attached to it.
      • Milestone "Creative Approved" is dated Oct 28.
      • "Write 12 ad variations" — in progress, Mia Alvarez, due Oct 26
      • "Design 8 creative assets" — todo, Sarah Chen, due Oct 27
      • "Build landing page" — todo, Dev Patel, due Oct 28

      Measured from your data. No part of this was written by a model.

    • warning1 team member over capacity−5 pts

      Sarah Chen is at 119% (43h assigned vs 36h capacity)

      Why?(1 row)
      low confidenceEstimate hours on tasks due within 7 days, divided by each person's stated weekly capacity.
      • Sarah Chen — 43h due in the next 7 days vs 36h weekly capacity (119%); 10h of that sits on this project, across 4 projects

      Measured from your data. No part of this was written by a model.

  • Due Nov 26 · 36% of the work done against 60% of the time · 24 points behind pace

    No signals fired on this project.

  • Due Dec 3 · 14% of the work done against 33% of the time · 19 points behind pace

    No signals fired on this project.

How this was produced

Ten checks ran against every active project: overdue work, remaining work versus time left, passed deadlines, blocked tasks, inactivity, unowned work, client silence, unfinished upstream work, over-committed people, and milestones inside a week. Each finding subtracts points from a starting score of 100 on a curve that never bottoms out, so the worst project stays comparable to the second worst. Every number on this page can be traced to specific rows — open any “Why?” to see them.

6 of 8 data-quality checks passed. See what the gaps cost you →